micro-blog
Currently you in: HomeAbout usQuality witnessAuthorized lab tests

Authorized lab tests

leak detector
Adjustable rate calibration instrument
Motor integrated test system
 

Testing principle

Simulating the temperature and humidity of natural environment to test the performances of the unit, making sure the unit works well in various conditions. Theodoor heat pump water heaters make contributions to the energy-saving and safety for everyone.

Process control

Strict testing procedures are covering developing, testing and manufacturing. Quality control is implemented in each process.

Mainly tested parameter

COP, heating capacity, electricity consumption, water temperature

  • laboratory
  • manufacturing shop
Copyright (C) 2012 GZ Theodoor Tech Co., Ltd. all rights reserved    Guangdong ICP No. 05074175
Links
金拉霸一直黑 安徽快三今天出的什么号 1188博彩 辽宁可靠的在线配资平台 江苏十一选五开奖结果l 官方精准三半半波中特 浙江11选5预测号码专家 玩五分赛车赢钱提不了现 今日上证指数000001 湖北11选5历史 幸运飞艇官方推荐网址